P50 50kg railroad rail U71Mn 45Mn

Payment Type: L/C,T/T,D/P,Paypal,Money Gram,Western Union
Incoterm: FOB,CFR,CIF,FCA,CPT
Min. Order: 10 Ton
Delivery Time: 20 Days

Basic Info


Model No.: 50kg p50

Type: Steel Rails, Steel Rail/train Rail

Alloy: Non-alloy

Brand Name: HAOYUAN

Package: Paint, Tied

Size: 8kg/m-60kg/m, P50

Application: Railway, Track

Materials: Q235B,55Q,U71Mn,50Mn,45Mn

Standard: YB/T5055-2014,GB 2585-2007

Certification: ISO.UKS.SGS.BV

Crafts: Hot Rolled


Additional Info


Packaging: in bundles

Productivity: 500T/Day

Brand: HAOYUAN

Transportation: Ocean,Land,Air

Place of Origin: CANGZHOU

Supply Ability: 50000T/Month

Certificate: ISO.API.CE

HS Code: 7302100000

Port: TIANJIN,SHANGHAI,QINGDAO


Product Description

P50 50kg railroad steel rail U71Mn 50Mn 45Mn 12mtr the heavy rail.According to the steel grade of steel are divided into: the manganese content in the common rail, containing copper, P50 50kg railroad steel rail U71Mn 50Mn 45Mn 12mtr carbon steel rail, high silicon containing copper, silicon, Steel Rail is a steel products , which is hot rolled by square billet . Steel Rails include 

light steel , heavy steel rail ,Crane Steel Rail .Train Steel Rails . they can used in 

train rail  ,mine railroad ,Crane charge Crane Rail  and so on .

 manganese, copper rail rail steel rail tracks, etc.Mainly has 38, 43, three kinds of 50 kg/sack.In addition to the 45 kg rail is used in a few lines, P50 50kg railroad steel rail U71Mn 50Mn 45Mn 12mtr has plans in big capacity and high speed of 60 kg rail lines.GB2585-81P50 50kg railroad steel rail U71Mn 50Mn 45Mn 12mtr  defines the 38 ~ 50 kg/m rails of technical conditions,P50 50kg railroad steel rail U71Mn 50Mn 45Mn 12mtr  such as its size and code as shown in table 6-7-10.


Steel Rails Specification

 Specification of rail

Rail material

Rail material

High-quality products

China Steel Rail
 

crane rail-Train Rail

 

railroad rail

 

Rail is the main component of the railway track. Its function is to guide the wheels of locomotive vehicles forward, to withstand the enormous pressure of the wheel, and passed to the sleeper. The rails must provide a continuous, smooth and minimal rolling surface for the wheels. In electrified railway or automatic block, the rail can also serve as a track circuit.

 

Steel Rails Production Process

 Steel Rails Production Process

Steel Rails workshop

 Steel Rails workshop 

90 lbs rail

60 lb rail dimensions
 
 

Production Process
 

Sales Network









Contact Info

CONTACT US

CANGZHOU HAOYUAN PIPE FITTINGS MFG CO.,LTD

Address: Yanshan County,Cangzhou,Hebei

Contact Person: YIN

Phone:86-317-3025890

Fax:86-317-3200713

Full name Contact Phone Content
点击刷新验证码